2019.4.8
The feeder and conveyer supplied by Shanghai Agiland completed with dry-run. And delivered to Lenzing(Nanjing) on Mar.28th,2019.We have spent 5 months for design, manufacturing and commission.
The engineer of Lenzing(Nanjing)are satisfied with the design, manufacturing and quality after on-site inspection .
The equipment will be installed on Apr.18th,2019.